200 Gateway Blvd
Toronto, Ontario M3C
A 17-storey, 284-unit private rental building built in 1966.
- Property manager
- Novi Properties
Reviews
No reviews yet
If you live here, or used to, you know things a listing never mentions.
Issues & maintenance
Leaks, outages, repairs: dated reports from residents. None filed yet.
Sign in to report a problem or maintenance work here.
City bylaw and health cases
20 bylaw investigations at this address since Feb 2024; 7 notices or orders to comply; 3 still open.
A case starts with a complaint or an officer’s visit, so it is not a finding against the building. In a condo, a complaint about one unit is filed under the building’s address.
- Repairs and upkeep 14
- Garbage 5
- Zoning 1
- May 2026
Repairs and upkeepBylaw· Closed
Case 26 160583 PRS 00 IR
- Feb 2026
GarbageBylaw· Closed
Case 26 112419 WST 00 IR
- Feb 2026
Repairs and upkeepBylawOrder to comply · Feb 2026· Closed
- Throughout Dwelling Unit: Exterior window not maintained weather-tight condition to prevent drafts or leakage and protected by suitable materials to prevent the entry of pests. (open)
Case 26 112727 PRS 00 IV
- Feb 2026
Repairs and upkeepBylaw· Closed
Case 26 112049 PRS 00 IR
- Oct 2025
ZoningBylaw· Closed
Case 25 242288 ZON 00 IR
- Sep 2025
Repairs and upkeepBylaw· Closed
Case 25 230743 PRS 00 IR
Show 14 older cases
- Aug 2025
Repairs and upkeepBylaw· Closed
Case 25 208999 PRS 00 IR
- Jun 2025
Repairs and upkeepBylawOrder to comply · Jun 2025· Closed
- Building – Centre Front: Communication system is not maintained in good repair and in operative condition. Namely, the Intercom at the Main Entrance of the Building. (open)
Case 25 184012 PRS 00 IV
- Jun 2025
Repairs and upkeepBylaw· Closed
Case 25 183246 PRS 00 IR
- Jun 2025
GarbageBylawNotice to comply · Jun 2025· Closed
Case 25 178633 WST 00 IV
- Jun 2025
GarbageBylaw· Closed
Case 25 178589 WST 00 IR
- May 2025
GarbageBylawNotice to comply · May 2025· Closed
Case 25 156569 WST 00 IV
- May 2025
Repairs and upkeepBylawOrder to comply · May 2025· Closed
- Building: The property is not being kept free of conditions which may encourage infestation. Namely, the Exterior Pest Control boxes are not in good working condition. (closed)
- Accessory Building: The accessory building is not constructed and/or maintained in good repair. Namely, the Accessory attached to the Front of the Building cover cable wires. (closed)
- Building: Exterior window(s) with broken/cracked glass. Namely, the Windows on the First Floor at the Front of the Building. (closed)
- Building: Garbage container or receptacle is not maintained in a clean and odour free condition. Namely, the Garbage receptacles throughout the Exterior and Interior of the Property including the Underground Parking Levels. (closed)
Case 25 156261 PRS 00 IV
- May 2025
Repairs and upkeepBylaw· Closed
Case 25 155021 PRS 00 IR
- May 2025
GarbageBylaw· Closed
Case 25 155018 WST 00 IR
- Apr 2025
Repairs and upkeepBylaw· Closed
Case 25 149214 PRS 00 IR
- Jan 2025
Repairs and upkeepBylawNotice to comply · Jan 2025· Closed
Case 25 102335 PRS 00 IV
- Jan 2025
Repairs and upkeepBylaw· Notice Issued
Case 25 102106 PRS 00 IR
- Feb 2024
Repairs and upkeepBylawOrder to comply · Apr 2024· Rescheduled
- Exterior – North, North West North West and South West Exit Stairways: The protective/decorative finish on the exterior surfaces is not being maintained in good repair. Namely; guards finish damaged /rusting (closed)
- Exterior – North West Stairway: The guards and/or other appurtenant attachments) and/or their supporting structural members are not being maintained free from defects/hazards. Namely: damaged missing picket (closed)
- Exterior – Garbage Screen: The fence, screen and/or other enclosure around or on the property is not being maintained in good repair. Namel; damaged Garbage Sceen (closed)
- Exterior – Front West Side: The light standard(s) supporting artificial light is not kept in good repair and in good working order. Namely; damaged / missing Light (closed)
- Exterior – Front West side: All repairs shall ensure that the component repaired can perform its intended function. Namely; damaged flower pot (closed)
- Exterior Of Building – Front Column: The exterior surface of the building shall be maintained free of graffiti and/or painted slogans. (closed)
- Exterior Of Building – Front Doors: The protective/decorative finish on the exterior surfaces is not being maintained in good repair. Namely; the finish on door frame is damaged (closed)
- Exterior Of Building – Walls Throughout where required: The protective/decorative finish on the exterior surfaces is not being maintained in good repair. Namely; Finish damage (closed)
- Exterior Of Building – Balcony Panels Throughout Where required: The protective/decorative finish on the exterior surfaces is not being maintained in good repair. Namely; Balconies Rusting (open)
- Exterior Of Building – Balcony Handrails and Guards: The protective/decorative finish on the exterior surfaces is not being maintained in good repair. Namely; Damaged / Rusting Handrails and Guards (open)
- Exterior – Parking Garage Ramp: Height of the guard for exit ramps and landings is less than 1,070 millimetres measured vertically to the top of the guard fromthe ramp surface where the difference in elevation between the adjacentground or floor level and the ramp is mor… (closed)
- Exterior – Parking Garage Ramp: The guard is designed that a member, attachment or opening located between 140 millimetres and 900 millimetres above the level being protected facilitates climbing. (closed)
Case 24 136899 PRS 00 IV
- Feb 2024
Repairs and upkeepBylaw· Rescheduled
Case 24 120230 PRS 00 IR
Contains information licensed under the Open Government Licence – Toronto. Bylaw investigation activity (open cases, and those closed in the last two years) and residential health hazards.
City building permits
9 permits the City has issued at this address since 2000 - repairs, alterations and system work that needed one. Official records, not resident reports.
- Heating, cooling and ventilation 2
- Parking garage repair 2
- Alterations 2
- Balcony repair 1
- Fire and life safety 1
- Plumbing and drains 1
- Apr 2025
Balcony repair · Balcony/Guard Repairs · Inspection
The work under this Contract is to repair the deteriorated concrete balconies, replace the balcony guards (including the ground level terraces), apply a new pedestrian deck coating to all balcony slabs, and perform masonry repairs. This al…
Permit 25 151144 BLD · est. $4,000,000
- Apr 2025
Heating, cooling and ventilation · Alter: Boiler/Furnace/AC Replacement · Permit Issued
Proposal to replace the boilers in an existing apartment building.
Permit 25 140680 MSA
- Jan 2020
Parking garage repair · Garage Repair/Reconstruction · Closed
Proposed new Garage Repair/Reconstruction by additing new beam and posts in the electrical room and add new block wall in the P1 parking.
Permit 20 107175 BLD
- Jul 2011
Fire and life safety · Sprinklers · Closed
Gateway Properties-Replace sprinkler system in the parking garage
Permit 11 246401 FSU
- Apr 2011
Alterations · Interior Alterations · Closed
Emergency generator room - P1 Level - 200 Gateway Ltd
Permit 11 180081 BLD · est. $10,000
- Dec 2010
Heating, cooling and ventilation · Alter: Boiler/Furnace/AC Replacement · Closed
Installation of a new 80kw Diesel generator for emergency lighting.
Permit 10 314029 MSA · est. $80,000
Show 3 older permits
- Apr 2009
Plumbing and drains · Backflow Prevention Devices (Water only) · Closed
Installation of 1 backflow preventor
Permit 09 128298 PSA
- Sep 2007
Parking garage repair · Garage Repair/Reconstruction · Closed - Dormant
Repair of expansion joint to a ledger beam.
Permit 07 258638 BLD
- Mar 1998
Alterations · Interior Alterations · Closed
RETROFIT
Permit 98 251070 BLD
Contains information licensed under the Open Government Licence – Toronto. Cleared permits and active permits. Contractors are named only on permits filed since 2017.
From City of Toronto open data
Neighbourhood
Living score
74/ 100
Each category is ranked against every other Toronto building on this site: 70 means better than 70% of them.
- Transit76
34.3 departures an hour at the morning peak within 500 m, on 5 routes. Nearest subway or LRT: Don Valley (5 Eglinton Line), 750 m.
- Parks & trees97
60.3 ha of parkland within 800 m; nearest park 180 m. 220 street trees within 300 m.
- Cycling82
Within 1 km: 1.55 km of protected lanes, 7.95 km of bike lanes and trails, 0 km of shared routes. 3 Bike Share stations within 500 m.
- Schools nearby52
5 public or Catholic schools within 1 km (nearest: Grenoble Public School, 210 m). Distance only: being near a school does not mean being in its catchment.
- Daily amenities81
Within 1 km: 1 library, 3 community centres, 7 licensed child care centres.
- Road safety40
4 collisions with serious injury or death within 500 m, 2021–2025. Fewer scores higher.
What matters to you?
Change how much each category counts. The score above updates as you go; nothing is saved.
Map
Turn layers on and off to see what is around the building.
About 1.2 km around the building. Select anything on the map for details. Map data © OpenStreetMap contributors.
Also worth knowing
Shown for context. None of this is part of the living score.
Safety
Flemingdon Park
- AssaultAbout typical
Lower than 55 of every 100 Toronto neighbourhoods (about the city median).
- Break and enterAmong the lowest
Lower than 97 of every 100 Toronto neighbourhoods (40% of the city median).
- RobberyAmong the lowest
Lower than 91 of every 100 Toronto neighbourhoods (45% of the city median).
- Auto theftAbout typical
Lower than 70 of every 100 Toronto neighbourhoods (76% of the city median).
- Theft from vehiclesAbout typical
Higher than 58 of every 100 Toronto neighbourhoods (about the city median).
- Theft over $5,000Lower than most
Lower than 83 of every 100 Toronto neighbourhoods (65% of the city median).
- Bicycle theftAbout typical
Lower than 66 of every 100 Toronto neighbourhoods (71% of the city median).
- ShootingsAbout typical
Lower than 58 of every 100 Toronto neighbourhoods (about the city median).
How often police recorded each crime for every resident of the whole neighbourhood, averaged over 2023–2025. Places many people visit but few live in, like downtown, rank high for that reason alone, so this is not part of the living score.
Air
Don Valley Parkway, 670 m away
31.1 tonnes a year from 4 facilities, mostly RPM Canada Company Tremco Canada Division
Bands: traffic is high within 150 m of an expressway and moderate within 500 m; industrial is moderate under a tonne a year and high above. The industrial bands are ours, for orientation only: ChemTRAC totals mix substances of very different toxicity. Releases are self-reported to the City’s ChemTRAC program. For today’s readings see Air Quality Ontario.
Supervised consumption services
- Nearest site
- Casey House Inpatient Supervised Consumption Services, 6.2 km
- Sites within 1 km
- 0
Sites currently offering services, from Health Canada, updated 2026-09-15. Sites open and close; check the list for current status.
Zoning
Residential Apartment Commercial
- Category
- Apartment
- Zone label
RAC (f30.0; a1372; d1.5) (x16)- Height limit
- Set by the zone
Zoning By-law 569-2013, from City of Toronto open data. Exceptions (“x” numbers) and site-specific amendments can change what is allowed; check the City’s zoning map before relying on it.
Nearby change
- Open planning applications within 300 m
- 2
- Registered short-term rentals at this address
- 0
7 St Dennis Dr · 120 m away
Site plan · Under Review · submitted 2023-03-22
Site Plan Application in relation to (OPA), Zoning By-Law Amendment (ZBA), and Draft Plan of Subdivision (SUB) applications (22 187482 NNY 16 OZ and 22 188139 NNY.
City record200 Gateway Blvd · 0 m away
Rezoning · Council Approved · submitted 2023-03-01
The proposed development consists of a 47 storey residential tower with 8 townhouse units connected to its podium and a 12 storey residential building with accessory commercial uses at grade. The existing 17 storey apartment building will b
City record
Rezonings, site plans and subdivisions submitted in the last five years and still open.
Contains information licensed under the Open Government Licence – Toronto. Data as of 2026-10-03. Transit from TTC weekday schedules; parks, trees, cycling, schools, libraries, community centres, child care, collisions, crime, expressways, ChemTRAC releases, planning applications and short-term rental registrations from open.toronto.ca; Bike Share stations from Bike Share Toronto; supervised consumption sites from Health Canada.
From CMHC and the City of Toronto
Rent
Average rents nearby
Monthly rent in purpose-built rental apartments, October 2025.
| Bedrooms | Flemingdon Park | North York (Southeast) zone | Toronto region |
|---|---|---|---|
| Studio | - | $1,188* | $1,491 |
| 1 bed | $1,595 | $1,638 | $1,761 |
| 2 beds | $1,802 | $1,890 | $2,045 |
| 3+ beds | $2,152 | $2,238 | $2,294 |
| All units | $1,759 | $1,842 | $1,917 |
Averages over every unit, including long tenancies under rent control, so they run below what a new lease costs today. Condominium units rented out by their owners are not included. “-” means too few units were surveyed to publish; * marks an estimate CMHC rates poor. Source: CMHC Rental Market Survey, under the Open Government Licence – Canada.
Rent reductions after property-tax cuts
When a rental property’s tax falls by more than 2.49%, Ontario law cuts its rents by a matching share, and the City writes to the tenants.
The City’s lists for 2014–2025 have no rent-reduction notices for this address.
Source: City of Toronto, Tenant Notification for Rent Reduction, 2014–2025.
Building facts
From the City of Toronto’s RentSafeTO registry, as reported by the landlord (registered 2017). Not resident reviews.
88 / 100City inspection score, July 2025. How buildings are scored
- Type
- Private rental
- Storeys
- 17
- Units
- 284
- Built
- 1966
- Elevators
- 3
- Managed by
- Novi Properties
- Heating
- Hot water
- Air conditioning
- None
- Laundry
- First floor, 8AM TO 11PM
- Pets
- Allowed
- Parking
- Underground garage, garage accessible thru buildg, surface parking
- Visitor parking
- Free
- Amenities
- Indoor pool, sauna
- Balconies
- Yes
- Smoke-free building
- No
- Sprinklers
- Yes
- Cooling room
- No
- Ward
- 16
Contains information licensed under the Open Government Licence – Toronto. Source dataset.
Discussion
Sign in to join the discussion.
No questions yet. Ask the first one.